South Tunnel (water tunnel through Golden Hill) [1926- ]
This tunnel was part of the first section (phase) of the Shing Mun Valley Scheme. It is marked (H) on the map below, connecting the South Conduit (G) to the Reception Reservoir (I).
Sorry, we don't have any photos with this tag yet.
This tunnel was part of the first section (phase) of the Shing Mun Valley Scheme. It is marked (H) on the map below, connecting the South Conduit (G) to the Reception Reservoir (I).
The conduit was part of the first section (phase) of the Shing Mun Valley Scheme. It is marked (G) on the map below, connecting the North Tunnel (F) to the South Tunnel (H).
Part of the first section (phase) of the Shing Mun Valley Scheme.
It was completed in late 1925, and is described in item 224.d of the PWD's Annual Report for 1925:
(d). North Conduit.—A Contract for $70,801.00 was let in February to Mr. Ng Wah who made excellent progress and completed the works by the end of the year. It commences at the termination of the Temporary Conduit in the Gorge below Pineapple Pass and discharges into the North Tunnel below Smuggler’s Ridge.
This tunnel was part of the first section (phase) of the Shing Mun Valley Scheme. It is marked (F) on the map below, connecting the North Conduit (E) to the South Conduit (G).