Current condition
Demolished / No longer exists
Date completed
(Month is approximate.)
Bridge over the Albany Nullah in a short distance uphill from the lower terminus. Can be seen on many early photos. Unclear when it was removed, latest when the new terminus was built in 2021/22.
The report technical-visit--peak-tramways.pdf refers: Lower Terminus platform situates about 42 m uphill from its original position and above an existing 2.4 m wide culvert.