Pacific Place was developed by Swire Properties. Phases One and Two were built on land formerly part of Victoria Barracks, one of the first military compounds in Hong Kong. The land was auctioned by the Hong Kong Government during redevelopment and was successfully bid for by Swire. It was purchased in two tranches in 1985 and 1986 for a total cost of US$1 billion. Phase One opened in 1988. The Conrad International Hotel was completed in 1991. Phase Three, built by Gammon Construction, was completed in 2004. It was developed from old buildings on Star Street, Wan Chai.
Phases
One
One Pacific Place
JW Marriott Hotel Hong Kong
The Upper House
Two
Two Pacific Place
Island Shangri-La
Two Pacific Place and Island Shangri-La hotel occupy respectively the bottom half and the top half of the tallest tower of the complex, which is 213 metres high and has 56 floors.
Comments
Re: Pacific Place
Hi there,
Phase One was completed in 1988. Phase Two was completed in 1991.
Best Regards,
T
Details about Pacific Place
Pacific Place was developed by Swire Properties. Phases One and Two were built on land formerly part of Victoria Barracks, one of the first military compounds in Hong Kong. The land was auctioned by the Hong Kong Government during redevelopment and was successfully bid for by Swire. It was purchased in two tranches in 1985 and 1986 for a total cost of US$1 billion. Phase One opened in 1988. The Conrad International Hotel was completed in 1991. Phase Three, built by Gammon Construction, was completed in 2004. It was developed from old buildings on Star Street, Wan Chai.
Phases
One
One Pacific Place
JW Marriott Hotel Hong Kong
The Upper House
Two
Two Pacific Place
Island Shangri-La
Two Pacific Place and Island Shangri-La hotel occupy respectively the bottom half and the top half of the tallest tower of the complex, which is 213 metres high and has 56 floors.
Conrad Hong Kong
Pacific Place Apartments
Three
Three Pacific Place
From Wikipedia